Figure DS-3

View of CCC Auditorium entrance on “drum side”

To help control the sound from the drums, some sort of acoustical panels are required where Partitions 3 & 4 are currently located
Partition 3 is at a ~45 degree angle to the stage wall and light troughs
Partition 4 is perpendicular to the stage wall and light troughs

We need to determine:

  • Will we use only Tectum walls to replace Partitions 3 & 4, or use Tectum walls in conjunction with other materials?
  • If we use other materials, will they be fixed in place or movable (for easier access to and increased storage) like the current Partitions?
  • At what distance from the stage wall and railing would the replacements for Partitions 3 & 4 be located (see purple lines and text)?
  • What would the other materials consist of?
  • Do we want a screen or curtain to hide the storage area from those going through the entrance?
  • Do we need something to discourage climbing/jumping through the railing?

If a new raceway is required, the orange line shows where it would need to transition to the existing light troughs